Feasibility study. Construction of 110/15 kV Muchówka substation including 110 kV power lines in Wygoda – Muchówka and Muchówka – Łososina relation and rebuilding 110/30/15 kV Łososina substation
To the order of TAURON Dystrybucja S.A. Branch in Tarnów, EMCA Volt Sp. z o.o. prepared “Feasibility study. Construction of 110/15 kV Muchówka substation including 110 kV power lines in Wygoda – Muchówka and Muchówka – Łososina relation and rebuilding 110/30/15 kV Łososina substation”
The following has been performed within the order:
- technical solutions for the line
- description of the existing state of station 110/15 kV Wygoda, distribution station 15 kV Muchówka and station 110/30/15 kV Łososina
- planning analysis
- natural environment analysis
- cataloguing recognising and usufruct structure on real estates intended for the investment
- description of a designed state
- estimated investment outlays for the project implementation