Construction designs, detailed designs, feasibility studies:
Design concept and feasibility study for the terminal of three 110 kV lines to the designed Ujrzanów station, Siedlce commune
Performance of a variant design concept and feasibility study for the reconstruction of the existing overhead HV 110 kV line into a cable line, pylon No 34 in Sokołów Podlaski – Siedlce – GPZ Sokołów Podlaski gate line
Construction of duble-track 400 kV Ostrołęka – Olsztyn Mątki line with the temporary operation of a single track with the voltage of 220kV in Ostrołęka – Olsztyn relation
Feasibility Study: A development concept for HV and MV power grid within the area of the existing SE 220/110/30 kV Blachownia in connection to the plans for rebuilding LV network within this area.
Rebuilding design for 110 kV line of Łęczna – Bogdanka relation.
Design documentation for the adjustment of 110kV overhead line in Szprotawa – Przemków relation to the working temperature of +60OC
The audit of 110 kV line and 110/SN station connected with Ełk 1 station
Construction of 400 kV cable line, in CHP Wrocław – Pasikurowice substation line
Designed rebuilding of single track 110kV overhead line in GPZ Głubczyce – GPZ Prudnik relation
Designed rebuilding of single track 110kV overhead line in GPZ Groszowice– GPZ Ozimek relation
Modernisation of MV and LV power supply systems in PSE S.A buildings with Branch in Katowice
Expert’s opinions concerning the connection of facilities into the State Power System
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Ostróda Biogas Power Station with the capacity of 500 kW.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Malbork Południe 2 Biogas of two wind turbines with the capacity of 2 MW each in Gronajny, Sztum commune.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Bartoszyce of photovoltaic power plant with the capacity of 850kW in Bartoszyce.
Expert’s opinion on the impact on the power system of increasing connection power of EKODROB manufacturing plant to 5.3 MW – primary and secondary power supply.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Dobre Miasto of photovoltaic power plant Zajączki with the capacity of 1000kW in Ełdyty Małe.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Nowy Dwór Gdański of wind power plant Niedźwiedzica III with the capacity of 1MW in Bronowo in Stegna commune.
Expert’s opinion on the impact on the power system of the connection to GPZ of photovoltaic power plant Zalewo with the capacity of 9000 kW in Surbajny, Zalewo commune.
Expert’s opinion on the impact on the power system of increasing connection power of Mlekpol milk manufacturing plant to 7 MW for primary power supply and to 7 MW for secondary power supply.
Expert’s opinion on the impact on the power system of the connection of Malbork Sugar Manufacturing Plant with the capacity of 7.5 MW for primary power supply.
Expert’s opinion on the impact on the power system of increasing the installed capacity of wind power plant Janowo Elbląg commune connected to the power grid 15 kV coworking with GPZ Elbląg Radomska”.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Nowy Dwór Gdański of wind power plant with the capacity of 2 MW in Chlebówka Nowy Staw Commune”.
Expert’s opinion on the impact on the power system of increasing the connection power of a manufacturing plant in Lidzbark Warmiński ul. Topolowa 1 to 7 MW for primary and secondary power supply .
Expert’s opinion on the impact on the power system of the connection to GPZ Kwidzyn Północ of photovoltaic power plant Gurcz with the capacity of 995 kW Kwidzyn Commune.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Nidzica 2 wind power plants with the capacity of 2.3 MW each in Lysakowo Nidzica Commune.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Iława Wschód of photovoltaic power plant kałduny with the capacity of 920 kW in Kałduny Iława commune.
EExpert’s opinion on the impact on the power system of the connection to GPZ Wielbark of photovoltaic power plant Wielbark with the capacity of 8000 kW in Wielbark Wielbark commune.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Lubawa of photovoltaic power plant Kołodziejki with the capacity of 1000 kW in Pomierki-Kołodziejki Lubawa Commune.
Expert’s opinion on the impact on the power system of increasing the installed power from 12 MW to 13.2 MW of wind power plant Iława 2 (Trupel) connected to distribution station 15 kV GPZ Iława.
Expert’s opinion on the impact on the power system of the connection to power grid 15 kV supplied from GPZ Olsztynek of photovoltaic power plant Sudwa with the capacity of 1000 kW in Sudwa Olsztynek Commune.
Expert’s opinion on the impact on the power system of a wind farm with the connection power of 45.6 MW located in Huszlew Commune.
Expert’s opinion on the impact on the power system of a wind farm with the connection power of 16.5 MW located in Piaski, Kraśnik Commune.
Expert’s opinion on the impact on the power system of 110 kV of a facility in Mielec with the connection power of 27 MW.
Expert’s opinion on the impact on the State Power System of the connection of receiving devices of KRONOSPAN HPL Sp. z o.o. Manufacturing Plan in Pustkowo with the connection power of 15 MW.
Expert’s opinion on the impact of connecting Detmarowice power plant with the installed capacity of 200MW (120MW variant) to an allocated area in the Czech Republic supplied with power from 110kV TAURON Dystrybucja S.A. with Branch in Gliwice (Pogwizdów station) resulting in a balanced inflow to 110kV network in the connection point (in the Polish and Czech boundary) with the connection capacity of 110MW (60MW variant) on the operation and parameters of KSE
Expert’s opinion on the impact of connecting at ECII Grupa Azoty S.A. Tarnów, a release and condensation turbo unit with the connection capacity of 20 MW on the State Power System
Expert’s opinion on the connection of the target power supply of KGHM Polska Miedź S.A. facility – Mining Shaft GG-1 with the connection capacity of 20 MW for primary and secondary power supply on the State Power System
Expert’s opinion on the impact of receiving devices of WEPA PROFESSIONAL Piechowice S.A. Paper Manufacturing Plant with the connection capacity of 12 MW on the State Power System
Expert’s opinion on the impact of receiving devices of PCC Rokita S.A. Manufacturing Plant with the connection capacity of 115MW on the State Power System